Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Products

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Overview Product Description Low Cost Prefab Warehouse/industrial Metal Building/prefab Workshop Steel Structure Hotel B

Send your inquiry

DESCRIPTION

Overview
Basic Info.
Model NO. A12
Type of Steel For Building Structure H-Section Steel
Residential Wall Structure Wall Stud
Application Steel Workshop, Steel Structure Platform, Steel Fabricated House, Structural Roofing, Frame Part, Steel Walkway and Floor, Steel Structure Bridge
Door Sandwich Panel or Steel Plate
Roof Sandwich Panel
Wall Sandwich Panel or Steel Plate
Frame Transport Package
Sandwich Panel Thickness Between 50-200mm
Life Time Over 35-60years
Material of Door Sandwich Panel, Steel or Wooden Door
Roof and Wall Material EPS, Fiberglass, Rock Wool Sandwic
Brick Wall Customized as Requested
Service Design, Manufacture, Delivery, Install
Surface Treatment Hot-DIP Galvanized, Painting
Purlin C/Z Purlin
Window Sliding Window, Fixed Window, Top Hung Window
Wall Cladding Glass Wool Composite Sandwich Panel on Site
Design Load Wind, Snow, Seismic
Transport Package Stanard Package
Specification Customized
Origin Shandong, China
HS Code 9406900090
Production Capacity 50000
Product Description

Product Description

Low Cost Prefab Warehouse/industrial Metal Building/prefab Workshop Steel Structure Hotel Building

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

The steel structure buildings is a customized product. no matter small or large building, our engineers will help you design it.it is very popular to use in a variety of purposes including storage, work spaces and living accommodation.It is low cost than concrete building, easy installation, environment friendly, light weight, corrosion-proof, short construction time, longer life to use.We could give you suggestions according to your climate. We also could make totally according to your design.Prefabricated steel structure buildings including the main steel structures, secondary steel structures, cladding materials, window&doors, bolts etc.we will according your project to design and quote , will offer the low costs and stable building for you.

Prefabricated steel structure cow shed use the high quality steel structure for the framework,steel sheet or sandwich panel for the wall/roof, this shed protects the cows from storm and rain.cold and warm, the cowshed can be small or large, we can customize the shed as per clients' requirements.

SpecificationSpecification
ItemsSpecification
Main Steel FrameColumnQ235, Q355,Q390 Welded H Section Steel
BeamQ235, Q355,Q390 Welded H Section Steel
Secondary FramePurlinQ235 C and Z purlin
Knee braceQ235 Angle Steel
Tie RodQ235 Circular Steel Pipe
BraceQ235 Round Bar
Vertical and Horizontal SupportQ235 Angle Steel, Round Bar or Steel Pipe
Maintenance systemRoof PanelEPS Sandwich Panel / Glass Fiber Sandwich Panel /
Rock Wool Sandwich Panel / Pu Sandwich Panel /Steel Sheet
Wall PanelSandwich Panel / Corrugated Steel Sheet
AccessoriesWindowAluminiumn Alloy Window / PVC Window / Sandwich Panel Window
DoorSliding Sandwich Panel Door / Rolling Metal Door
RainspoutPVC
Live load on RoofIn 120kg/Sqm (Color steel panel surrounded)
Wind Resistance Grade12 Grades
Earthquake-resistance8 Grades
Structure UsageUp to 50 years
Finishing OptionsVast array of colors and textures available
Paint OptionsAlkyd paiting, two primary painting, two finish painting
(Primer ,Medium paint ,top coat, epoxy zinc etc.) Or Galvanized.

prefabricated Steel Structure Design Livestock Farm Shed Goat /Cattle Farms cow shed Building poultry farms
1.Prefabricated steel structure building is manufactured and constructed using prefabrication.
It consists of factory-made components or units that are transported and assembled on-site to form the complete building.The building is made from welding H section steel as column and beam. Some buildings also have crane beam, which made from H steel beam too. Galvanized C, Z section steel are as wall purlin and roof purlin. Each component uses welds, bolts or rivets to connect. Wall and roof are made of metal steel sheet or sandwich panel.
2. Steel Structure House Advantages
(1).Good in heat and sound insulation, good corrosion resistance and light weight;
(2).Roofing and wall uses light sandwich panel or color single panel, which has good earthquake resistance and integration;
(3).Multiple disassembly and assembly, with the rate of recovery up to 70%.
3.Steel Structure House Usage
Steel structure is widely used in the construction site as temporary office, factory, warehouse, city office, civil resettlement,4S stores and other temporary buildings,etc.when you build a steel structure building, there are a lot of chooices for the type and apperance ,
For structure frame: you can make the building high and low span, lean to building, H section frame or tube frame ,hanrail, fence etc For the building coverage: you can choose brick wall height, single steel sheet, sandwich panel, skylight belt, ventilation fitting, out gutter, inner gutter, dow spout etc For the window and door: you can choose sliding door , electricity roller shutter door, swing door, exist, sliding window, swing window,top-hung window,vent etc
4.Production and processing
Our steel structure building have many applications and uses. Workshop, warehouse, office building, multi-story building, hangar,garage, livestock farm,poultry farm ect.
(1).Low cost, convenient
(2).Easy assembly and disassembly many times without damage
(3).Widely used in construction site, office building dom ect
(4).Good environmental protection

Detailed Photos

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Features: 1. The frame adopts national standard hot-dip galvanized steel pipe or plastic-coated steel pipe, which has a long service life.2. Specially designed connecting fasteners are easy to install and firm in structure.3. Less investment, suitable for breeding.4. Fans and water curtains with ventilation windows (sides) can better control the indoor environment.Steel structure livestock shed Prefabricated Cow Farm House/Goat Farm Shed is a kind of light steel structure building. The frame of the building consists of H section steel columns, H section steel beams and C or Z section purlins. Generally there are two types of cow farm house/goat farm shed,open type and close type.Open type house usually has three walls,one side is open. Close type house has whole wall and roof, some windows on wall. You can choose which type of house you want, depending on your feeding requirements and local climate.

product display

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Why Choose Us to offer steel structure workshop building: 1.We have a group of professional engineers, most of whom has more than 10 years experiences in architecture field. our company has got a various of experiences in design, manufacture, installation and so on. The work staff have excellent skills. Some of them had helped customers to install the warehouse around the world.2. We will offer one stop service. construction drawing,calculation sheet will be offered to help you get construction permit. Foundation design could be free made if you need. We could make 3D drawings to show the view. What's more, Installation drawings will be offered and Steel structure column,beams will be marked number on it to help you install.3. We will send you extra bolts,purlins,panels incase any damage when install.
4. Efficiency is our pursuit. Every inquiry ,emails will be replied immediately. Every questions will be paid high attention.5. We also have possessed more than 40 sets of large precise and domestically advanced processing equipments, including large gantry planing machines, automatic submerged arc welding machines, assembling machines, slitters, shot blasting machines and soon.6.We will offer details packing list for every container when load so it will be easier to unload.7. "Moral personality decides product quality." is our guarantee to the products. "Customers come first." is our everlasting pursuit. Believe your choose, we'll give you a satisfied answer.

Company Profile

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Team style

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

certificate display

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Packing and shipping

Low Cost Prefab Warehouse/Industrial Metal Building/Prefab Workshop Steel Structure Hotel Building

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by therules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.
(2) At the time of loading, there must be a special supervision, check car number and packing, the car pileup securely, and to increase the necessary binding component loosening, prevent the loss.
(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle. (4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.
(5) The member to the construction site, timely organization of unloading, stacking area.
(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.
FAQ

Low Cost Prefab Warehouse/industrial Metal Building/prefab Workshop Steel Structure Hotel Building

Q1: How long does it take to get my building? A: Lead time is vary, but typically 2 weeks of drawings and 6-8 weeks for delivery(depending on complexity)Q2: What are the benefits of steel construction?
A: 1-Durable and with long lifespan. 2-Short construction period than concrete and wooden building. 3-Low cost and reusable.4-High strength and light weight, has good seismic performance.5-Widely used for multi-purpose buildings.Q3: Why choose JU HE?
A: At JU HE, the customer is the first priority. We don't pull any gimmicks. We are veteran owned andoperated business, unmatched in customer service. We have more than 10 years of metal building experience. We are also very reputable manufacture and can answer your questions regarding any tape of construction project.We care about your needs and value your business.Q4: How can l get the quotation of the project? A: lf you have the drawing, we can offer you our quotation accordingly. lf youhave no design, our engineer will design for you to confirm. And then offer you a quotation.Q5: Do you offer designing service for us?
A: Yes, we can provide full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (X steel) and etc. We can design complex industrial building like office building,supermarket, auto dealer shop, shipping mall, hotel etc.Q6: Do you provide samples? A: Yes, we could offer the sample for free but do not pay for the cost of transportation.Q7: What is your terms of payment ?
A: L/C, T/T, and Western Union.Q8: How about your quality control?
A: We have our own professional quality control team with rich experience and advanced inspection equipment. Also we are willing to accept any other the third inspection part to control.Q9: Can you provide the installation help?
A: We will provide detailed instruction photos and videos to you. If it is necessary,we will send professional engineers to do the construction guidance, and some skilled workers to help for installation. However, the visa fee, air tickets,accommodation, wages will be provided by buyers.

Dear Customer

If you have drawings, welcome to share drawings with us, quotation will be done based your drawings. Our excellent design team will design the steel structure workshop warehouse for you. If you give the following information, we will give you an satisfactory drawing.
1 Location (where will be built? ) which country? which city?2 Size: Length*width* Eave height _____mm*_____mm*_____mm3 wind load (max. Wind speed) _____kn/m2, _____km/h, _____m/s4 snow load (max. Snow height) _____kn/m2, _____mm, temperature range?5 anti-earthquake _____level6 brickwall needed or not If yes, 1.2m high or 1.5m high? or other?7 thermal insulation If yes, EPS,fiberglass wool, rockwool, PU sandwich panels will be suggested; If not, the metal steel sheets will be ok. The cost of the latter will be much lower than that of the former.8 door quantity & size _____units, _____(width)mm*_____(height)mm9 window quantity & size _____units, _____(width)mm*_____(height)mm10 crane needed or not If yes, _____units, max. Lifting weight____tons; Max.Lifting height _____m